Deadline Anchor Native Slider

Deadline Anchor oilfield drilling rig equipment 1
Deadline Anchor oilfield drilling rig equipment 2
Deadline Anchor oilfield drilling rig equipment 3
Deadline Anchor oilfield drilling rig equipment 4
Deadline Anchor oilfield drilling rig equipment 5
Deadline Anchor oilfield drilling rig equipment 1 Deadline Anchor oilfield drilling rig equipment 2 Deadline Anchor oilfield drilling rig equipment 3 Deadline Anchor oilfield drilling rig equipment 4 Deadline Anchor oilfield drilling rig equipment 5

Deadline Anchor

A deadline anchor secures the dead end of a rig drill line and provides a sensing interface for a matched weight indicator. The anchor body and sensor must suit deadline pull, rope and reeving. It is not itself the display instrument. Request a manufacturer or supplier price in China with the mounting and load-monitoring requirements.

  • Anchor body and matched load sensor.
  • Horizontal and vertical installations.
  • Works with a compatible weight indicator.
  • Model-specific pull and reeving ratings.
Description
Technical Data
More Details
Contact Us Now
Description
CategorySpecification
Product NameDeadline Anchor
Model RangeJZG/JZ anchor and indicator pairings listed in the full table
Applicable IndustriesOil & Gas; Energy & Mining
ApplicationOilfield drilling rig systems
API RequirementsApplicable API and rig integration requirements to be confirmed
ConfigurationConfirm selected model and approved drawing
SelectionCheck loads, dimensions and rig interfaces
DocumentationSpecify inspection and traceability requirements
Factory Supply ScopeConfirm equipment, accessories and spare parts
Manufacturer InquiryProvide rig model and technical requirements
Supplier InquiryConfirm configuration and commercial scope
Exporter InquirySpecify packing and destination
PriceRequest a configuration-based quotation
Chinese EquipmentConfirm model-specific interfaces
China SourcingCompare the same technical and delivery scope
API certified ProcurementVerify certificate validity and applicable product scope
Packaging & DeliveryConfirm order-specific packing and delivery terms

A deadline anchor secures the non-moving end of the drilling line and transfers load information through its sensing arrangement to a compatible weight indicator. The main assembly consists of the anchor body and sensor. The indicator or recorder displays the measured load; the anchor itself is not the display instrument.

High-strength steel anchor configurations are available for horizontal and vertical mounting. Select the anchor according to deadline pull, rope specification, rig mounting, reeved-line arrangement and the intended sensor or hydraulic measuring system. Matching and calibration are necessary for useful hook-load and weight-on-bit indication.

Any proof-test requirement, including a proposed test-load multiplier, must be confirmed against the selected equipment design, applicable requirements and factory test record. Do not treat a general test statement as a universal operating rating.

Deadline Anchor selection requires deadline pull, drill-line size, reeving, mounting geometry, sensor compatibility and calibration. Compare the complete published model data with the installation duty and approved drawings. When sourcing from a Chinese deadline anchor manufacturer, supplier or exporter, ask the factory to identify equipment, accessories, inspection documents and spare parts included in the price. For procurement in China, specify applicable API rig equipment, installation and project inspection requirements. Verify certificate validity and the actual scope when API certified supply is requested; do not infer certification or operating limits from a model name.

Technical Data
Deadline Model Weight indicator

Model

Max. Deadline Pulling Force

(kN)

Qty of the line Capacity

(kN)

Output pressure sensor

(MPa)

 

 

 

 

 

 

Vertical

JZG42 JZ500 420 12 5040 6
10 4200
JZG35 JZ400 350 12 4200
10 3500
JZG24 JZ250 340 10 2880
8 2400
JZG20 JZ200 200 10 2000
8 1600
JZG18A JZ150A 180 10 1800
8 1440
6 1080
JZG15A JZ100A 150 6 1200
4 900
 

 

 

 

 

Horizontal

JZG41 JZ500A 410 12 4920 6.83
10 4100
JZG34A JZ400B 340 12 4080 6
10 3400
JZG18 JZ150 180 8 1440
6 1080
JZG15 JZ100 150 8 1200
6 900
JZG10A JZ40 100 6 600
4 400
We can designed as your request.

The complete published anchor/indicator table is retained. Confirm model-specific deadline pull, measuring capacity, reeving and sensor output with an approved factory drawing and calibration record.

Deadline Anchor technical drawing

More Details
What is deadline anchor used for?
A deadline anchor secures the dead end of a rig drill line and provides a sensing interface for a matched weight indicator. The anchor body and sensor must suit deadline pull, rope and reeving. It is not itself the display instrument. Request a manufacturer or supplier price in China with the mounting and load-monitoring requirements.
How is the correct configuration selected?
Specify deadline pull, drill-line size, reeving, mounting geometry, sensor compatibility and calibration and compare the model-specific specifications with the actual duty.
What is needed for a price quotation?
Send the selected model, required ratings, connections or mounting, accessories, inspection scope and delivery destination. Compare like-for-like manufacturer, supplier and exporter offers.
Which API documents should be checked?
State applicable API rig equipment, installation and project inspection requirements. For API certified procurement, verify certificate validity and whether its scope covers the offered product.
What should be confirmed before ordering?
The complete published anchor/indicator table is retained. Confirm model-specific deadline pull, measuring capacity, reeving and sensor output with an approved factory drawing and calibration record.
Contact Us Now

Contact Us For A Quick Quote

Full Deadline Anchor

Design Support

Email Support

Petro Solutions

Local Team Support on Deadline Anchor

Deadline Anchor

Deadline Anchor selection requires deadline pull, drill-line size, reeving, mounting geometry, sensor compatibility and calibration. Compare the complete published model data with the installation duty and approved drawings. When sourcing from a Chinese deadline anchor manufacturer, supplier or exporter, ask the factory to identify equipment, accessories, inspection documents and spare parts included in the price. For procurement in China, specify applicable API rig equipment, installation and project inspection requirements. Verify certificate validity and the actual scope when API certified supply is requested; do not infer certification or operating limits from a model name.