Deadline Anchor Native Slider
A deadline anchor secures the dead end of a rig drill line and provides a sensing interface for a matched weight indicator. The anchor body and sensor must suit deadline pull, rope and reeving. It is not itself the display instrument. Request a manufacturer or supplier price in China with the mounting and load-monitoring requirements.
| Category | Specification |
|---|---|
| Product Name | Deadline Anchor |
| Model Range | JZG/JZ anchor and indicator pairings listed in the full table |
| Applicable Industries | Oil & Gas; Energy & Mining |
| Application | Oilfield drilling rig systems |
| API Requirements | Applicable API and rig integration requirements to be confirmed |
| Configuration | Confirm selected model and approved drawing |
| Selection | Check loads, dimensions and rig interfaces |
| Documentation | Specify inspection and traceability requirements |
| Factory Supply Scope | Confirm equipment, accessories and spare parts |
| Manufacturer Inquiry | Provide rig model and technical requirements |
| Supplier Inquiry | Confirm configuration and commercial scope |
| Exporter Inquiry | Specify packing and destination |
| Price | Request a configuration-based quotation |
| Chinese Equipment | Confirm model-specific interfaces |
| China Sourcing | Compare the same technical and delivery scope |
| API certified Procurement | Verify certificate validity and applicable product scope |
| Packaging & Delivery | Confirm order-specific packing and delivery terms |
A deadline anchor secures the non-moving end of the drilling line and transfers load information through its sensing arrangement to a compatible weight indicator. The main assembly consists of the anchor body and sensor. The indicator or recorder displays the measured load; the anchor itself is not the display instrument.
High-strength steel anchor configurations are available for horizontal and vertical mounting. Select the anchor according to deadline pull, rope specification, rig mounting, reeved-line arrangement and the intended sensor or hydraulic measuring system. Matching and calibration are necessary for useful hook-load and weight-on-bit indication.
Any proof-test requirement, including a proposed test-load multiplier, must be confirmed against the selected equipment design, applicable requirements and factory test record. Do not treat a general test statement as a universal operating rating.
Deadline Anchor selection requires deadline pull, drill-line size, reeving, mounting geometry, sensor compatibility and calibration. Compare the complete published model data with the installation duty and approved drawings. When sourcing from a Chinese deadline anchor manufacturer, supplier or exporter, ask the factory to identify equipment, accessories, inspection documents and spare parts included in the price. For procurement in China, specify applicable API rig equipment, installation and project inspection requirements. Verify certificate validity and the actual scope when API certified supply is requested; do not infer certification or operating limits from a model name.
| Deadline Model | Weight indicator Model | Max. Deadline Pulling Force (kN) | Qty of the line | Capacity (kN) | Output pressure sensor (MPa) | |
|
Vertical | JZG42 | JZ500 | 420 | 12 | 5040 | 6 |
| 10 | 4200 | |||||
| JZG35 | JZ400 | 350 | 12 | 4200 | ||
| 10 | 3500 | |||||
| JZG24 | JZ250 | 340 | 10 | 2880 | ||
| 8 | 2400 | |||||
| JZG20 | JZ200 | 200 | 10 | 2000 | ||
| 8 | 1600 | |||||
| JZG18A | JZ150A | 180 | 10 | 1800 | ||
| 8 | 1440 | |||||
| 6 | 1080 | |||||
| JZG15A | JZ100A | 150 | 6 | 1200 | ||
| 4 | 900 | |||||
|
Horizontal | JZG41 | JZ500A | 410 | 12 | 4920 | 6.83 |
| 10 | 4100 | |||||
| JZG34A | JZ400B | 340 | 12 | 4080 | 6 | |
| 10 | 3400 | |||||
| JZG18 | JZ150 | 180 | 8 | 1440 | ||
| 6 | 1080 | |||||
| JZG15 | JZ100 | 150 | 8 | 1200 | ||
| 6 | 900 | |||||
| JZG10A | JZ40 | 100 | 6 | 600 | ||
| 4 | 400 | |||||
| We can designed as your request. | ||||||
The complete published anchor/indicator table is retained. Confirm model-specific deadline pull, measuring capacity, reeving and sensor output with an approved factory drawing and calibration record.




Deadline Anchor selection requires deadline pull, drill-line size, reeving, mounting geometry, sensor compatibility and calibration. Compare the complete published model data with the installation duty and approved drawings. When sourcing from a Chinese deadline anchor manufacturer, supplier or exporter, ask the factory to identify equipment, accessories, inspection documents and spare parts included in the price. For procurement in China, specify applicable API rig equipment, installation and project inspection requirements. Verify certificate validity and the actual scope when API certified supply is requested; do not infer certification or operating limits from a model name.